Thursday, November 27, 2008
Thursday, November 20, 2008
Wednesday, November 19, 2008
Monday, November 17, 2008
Kirchner and The Berlin Street
Kirchner and the Berlin Street, just finished showing at MoMA, had settled into a very nice groove. Busy when it first opened back in August, a lot of tourists, I must say, who made their way back home for September and some local populace who hadn't escaped to The Hampton's, eager for something new, the crowds thinned somewhat and it became a very nice exhibition to spend some time perusing, which I indeed did. They grew on me, those Berlin St scenes. Was hoping for another look last Sunday, but it had closed. Haven't bought the book yet, but I'm sure I will, finances permitting.
MoMA has a great online exhibition of the show
The show centred on a series of works painted 1913-15, known as the Street Scenes, depicting 'street walkers' or prostitutes.
MoMA has a great online exhibition of the show
The show centred on a series of works painted 1913-15, known as the Street Scenes, depicting 'street walkers' or prostitutes.
Saturday, November 15, 2008
Friday, November 14, 2008
Life in Sydney
From smh.com.au article here
Since 1998 16 different rail lines or extensions have been proposed, only two being delivered and one partially completed, here are the cancelled lines.
It's hard to believe that so many have been cancelled, why propose them in the first place? There has been discussion about what type of lines to build, add to the existing heavy rail network where stations are are 1-2 km apart, or build 'metro' style where stations are 1/2 - 1 km apart. Metro will work for high density, this would be great for the proposed Parramatta to Circular Quay line, 4 lines under Parramatta Rd, two express and two local. Other parts of Sydney not so.
One line that got built was a link to the airport, built in time for the 2000 Olympics, which is expensive, for two it's cheaper in a taxi, and it doesn't attract a lot a patronage
A mishmash of maps from The Sydney Morning Herald
Northwest metro Rouse Hill to the CBD via Gladesville, shown in black, proposed and cancelled in 2008!
Some success, Epping to Chatswood line completed, shown in purple, the continuation to Parramatta, part of the original 1998 proposal, not built.
Since 1998 16 different rail lines or extensions have been proposed, only two being delivered and one partially completed, here are the cancelled lines.
It's hard to believe that so many have been cancelled, why propose them in the first place? There has been discussion about what type of lines to build, add to the existing heavy rail network where stations are are 1-2 km apart, or build 'metro' style where stations are 1/2 - 1 km apart. Metro will work for high density, this would be great for the proposed Parramatta to Circular Quay line, 4 lines under Parramatta Rd, two express and two local. Other parts of Sydney not so.
One line that got built was a link to the airport, built in time for the 2000 Olympics, which is expensive, for two it's cheaper in a taxi, and it doesn't attract a lot a patronage
A mishmash of maps from The Sydney Morning Herald
Extension to Rouse Hill, proposed and cancelled twice
Y link Turn around at Liverpool proposed in 1998
Y link Turn around at Liverpool proposed in 1998
Northwest metro Rouse Hill to the CBD via Gladesville, shown in black, proposed and cancelled in 2008!
Wednesday, November 05, 2008
Saturday, November 01, 2008
My Friends: The Musical
from the people the brought you The Empire Strikes Barack comes My Friends: The Musical
Very, very funny
Very, very funny